Covering tracks

Curved track, and very near the pool mesothelioma lawyers san diego area more appropriate to carry out of solid concrete. To do this, the contour of the track set a wooden mold.On the leveled layer of compacted soil placed gravel (8 … 12 cm) and concrete (6 … 8 cm). The solution was kneaded in the same proportion as for the plates. On top of concrete level the spatula or trowel.After evaporation of moisture from the concrete surface to make a drawing – an imitation of natural stone tiles cheap mattress sets or irregular shape. Circle – wavy lines – you can make a tin can or a piece of corrugated asbofanery. Rough surface will be overwritten by normal brushing.In addition, the solid coating with beautiful naked aggregate (color gravel diameter of 1 … 2 cm), which, after leveling the concrete is poured evenly over the surface. Once the concrete hardens, the track will be overwritten by a trowel.Nice view and gives aggregate of large stones with a diameter 7 … 12 cm, which is pressed into the concrete surface. When the device covers the tracks should be routed to the left and right of the drainage tray.They can be made from a cut along the length of asbestos cement pipes or other waterproof material. It’s much prolong the life of the tracks. In the presence in the area of ??steep slopes and lifts suit small ladder.Their stage usually reduces the rate of cascading water flow, thus contributing to conservation cover tracks. If the water level goes around and finds a different way, blurring the sod soil, it should be directed to the drainage ditch trays.

Processing your request, Please wait....