Spring fitting

Recently, special to the Floor Ask the experts note the spring to install the floor, the experts said, "into the spring, floor moisture, mold can not be ignored is a big problem."

Moisture from the floor face to face inspection products to start

Is moisture resistant Flooring The most important technical indicators. If the floor of the moisture is bad, long in the geothermal "Zhengkao", once there is moisture to enter, the floor will Qiqiao edge, causing floor damage. The high quality flooring is high-density substrate, the excellent performance of its moisture, thickness swelling is much less than the national standard. In addition, special wear-resistant layer, decorative paper, equilibrium level, could well be backing the "closed" to ensure the overall moisture resistant floor better. Therefore, in the delivery of home flooring products, we must Kaifeng inspection to see whether the floor mold, signs of vermin, there is no breakage. Need some experience who can please help, some after the installation to ensure product quality.

On clear weather to determine the time to install the best

Flooring experts also told the reporter, select the floor of the pavement time is also very important. Temperature difference between day and night in spring, so the floor and ground

Brick The pavement should also pay attention to choose the right time, can never be proof of work. Wood flooring in the pavement, it should at 16 to 18 delegation two days at room temperature. Choose the best time to install the floor in fine weather, the best 7 days are sunny in the installation, and after the installation of dry ground floor. At the same time, be professional in the shop floor moisture below floor mats, to prevent the damp floor.

Moisture monitoring function of the decision to install installation technology

"Third floor seven install", floor moisture resistant is good indicator not only need to pass the floor itself, good or bad decision to install the floor moisture-proof function. Flooring experts told reporters that it must be a professional install the floor workers. Businesses will have a floor general brand home service professionals.

On the floor before installation, professional staff should be measured four different aspects of the preparatory work, such as post-construction process can be greatly enhanced accuracy and precision, and can effectively detect the ground, "sand, tide, concave, convex, crack the "Big Five on the specific degree. In addition, supervisory staff should also particularly concerned about the degree of ground moisture, were repeatedly detected later on the ground floor pavement.

Tips Solid wood flooring Moisture coup 1, ground-moisture treatment: generally use the "three oil two felt" (three

Asphalt Two layers of asphalt felt paper, and then wiping the top layer

Cement To prevent the release of harmful gas); simple approach is a layer of moisture-proof membrane.

2, to balance the plate by installing expansion: Some add a layer of hair in the keel of the floor, and some installation requirements plate 0.2mm wide gap between the left and some requests left corner trap convenient indoor moisture release, Some requested the floor wall joints are equipped with springs, and some aluminum keel, wooden floors, some with track installation methods.

I am China Crafts Suppliers writer, reports some information about rubberwood dining tables , antique chinese bench.

Processing your request, Please wait....

Leave a Reply