Guangxi Fire: Straighten unyielding flood of red spine – Fire Rescue, detachment

Recently, Guangxi from north to south there was a strong rainfall led to flooding in some areas.

The face of the raging flood, fire officers and men of Guangxi resident under the leadership of party committees and governments at all levels and, after a few of the affected area, completed the rescue mission. According to incomplete statistics, from May 30 to June 12, Guangxi, PRC fire rescue forces in the flood fighting and rescue people in distress 32 (27 survived), evacuated 148 people, transfer materials worth 2.3 million yuan.

Lens 1: auto parts manufacturing plant emergency

6 10 to 14 am, heavy rain, such as injection of Liuzhou City, the city's many low-lying areas of serious water logging.

14:30 the same day, Yang, and fire brigade received Liuzhou Liuzhou Automobile Co., Ltd. Dong Jie calls: Yang Jie Automotive Co., Ltd. Road East, more than 100,000 yuan in the machinery equipment and office computer has been plunged into a lake of water, water level has reached half a meter deep.

After receiving the alarm, the battalion deployed two Fire , 15 officers and men rushed to the scene to bring the rescue equipment.

Arrived at the scene, at first glance the plant is an ocean, part of the production of computer parts and office have been flooded, roads around the plant water poured non-stop, water level is also constantly rising.

Investigative inquiry that: The plant is located in the most low-lying sun and Development Department, an area of about more than 2000 square meters, office equipment and 20 000 car parts have been flooded, if not evacuate employees stranded , blocking the flood, the staff of life and of the whole plant parts will be engulfed, submerged plants washed away by the flood at any time possible.

Extremely urgent situation! Scene commander ordered an immediate rescue plan, the war officers and men divided into four groups. Group I: four officers and men of good water raft through the factory build a life-saving evacuation line staff. Group II: to the east to the south of the plant to block flood, prevent flood flows to the plant. Group III: use of pumps to the outside, the factory pump. Group IV: The open drainage channel operated rescue equipment, so that the flood discharge from the hospital the fire brigade to rapidly lower the water level.

Relief after the order was given, the officers and men of all war fighting immediately. 1 hour, officers and soldiers in the war efforts, the water level dropped more than 30 cm speed.

4 hours later, the war all the officers and men successfully plant water discharge, and on-site sewage and mud was cleared successfully evacuated hundreds of trapped workers, and machinery worth millions of computer equipment and office security zone transfer .

As relief in a timely manner, no casualties in the incident.

Lens 2: 4 hours to rescue 10 people trapped in an island

"10 assigned to drilling your base of Guangdong Guangzhou Express Railway Geological Survey team 703 workers were trapped in a sudden flash floods just over 20 square meters of the island … …"

6 7:57 the evening of 10, the Public Security Bureau Hezhou Hezhou fire brigade received reports of 110 command center of the danger, the squadron's chief of staff, Chen Jian-ping rate of 15 fire officers and men immediately drove 30 km outside of the scene rushed to the rescue .

6 9 Hezhou throughout dump heavy rain, to at 15:30 on the on the 10th about a sudden outbreak of mountain torrents, raging floods clamped rocks, trees, straight down, the river rose rapidly, Zhang Xinjian, Jiang Chunhua drilling workers, such as 10 face rapidly diminishing.

When they realized that danger, too late.

17:23, on the lower island, such as drilling equipment, diesel engines were roaring torrents swallowed, Zhang Xinjian so desperately scared of 10 drilling workers run the highest point of the island, frequently using mobile phones to the other side of my colleagues for help .

Arrived at the scene, officers and men of the people familiar with the terrain first attempt to use the assistance of the safety rope to carry out rescue, but the island nearly 300 meters from the shore, can not use the safety rope rescue.

"Immediately to the transportation, water, maritime sector support the request, using assault boats landing save lives." Field commander in accordance with the recommendations of the fire officers and men, and immediately issued an Order to save.

Night 11:21, Hezhou assault boat for the Marine Department, a rubber boat transportation to the scene. 6 familiar with water-based fire officers and soldiers and two Marine Department staff rushed island adventure driving and assault vessels, and trapped more than six hours of the 10 drilling workers converge.

I am China Computer Parts writer, reports some information about door chime alarm , prestige car alarms.

Processing your request, Please wait....

Leave a Reply